Consultants: M/s AWAJ Consultants
Client: M/s Emaar
Project Status: Ongoing
Main Contractor: Transemirates Contracting LLC Scope of work : Complete MEP Works
B+G+P+20/17+R Residential Building, Plot No: DHE-PA9B.0003, Dubai Hills Estate (Emaar), Dubai, UAE
Project Brief Summary
- Basement + Ground + Podium + 2 Towers (17 & 20 Floors) + Roof – Residential Building
- Project Completion = 28 Months
- Defect Liability Period = 12 Months
- Total no. of Apartment = 473nos.
1-Bedroom Unit = 234nos.
2-Bedroom Unit = 164nos.
3-Bedroom Unit = 75nos - District Cooling AC System = 2,120.07 Total TR
- · Supply of PHEX – 2nos, BTU Meter and Smart Valves
- LV Panel = 4nos. 7,117.45 KW TCL
- Standby Generator = 1no. 900KVA
- Busbar Riser = 2nos. 2000A TPN+E and 2nos. 1600A TPN+E
- ELV System
Structured Cabling System
CCTV System
Access Control System
Lighting Control System
Audio Intercom System
AV/BGM System
Gate Barrier - Building Management System
- LPG System
- Fire Protection System
Fire Fighting System (Vertical Fire Pump = 1000GPM @ 16.50 Bar)
Fire Alarm and Voice Evacuation System
Central Battery System