Club Place

Club Place

Consultants: M/s AWAJ Consultants
Client: M/s Emaar
Project Status: Ongoing
Main Contractor: Transemirates Contracting LLC
Scope of work : Complete MEP Works

 B+G+P+20/17+R Residential Building, Plot No: DHE-PA9B.0003, Dubai Hills Estate (Emaar), Dubai, UAE 

Project Brief Summary

  • Basement + Ground + Podium + 2 Towers (17 & 20 Floors) + Roof – Residential Building
  • Project Completion = 28 Months
  • Defect Liability Period = 12 Months
  • Total no. of Apartment = 473nos.
    1-Bedroom Unit = 234nos.
    2-Bedroom Unit = 164nos.
    3-Bedroom Unit = 75nos
  • District Cooling AC System = 2,120.07 Total TR
  • · Supply of PHEX – 2nos, BTU Meter and Smart Valves
  • LV Panel = 4nos. 7,117.45 KW TCL
  • Standby Generator = 1no. 900KVA
  • Busbar Riser = 2nos. 2000A TPN+E and 2nos. 1600A TPN+E
  • ELV System
    Structured Cabling System
    CCTV System
    Access Control System
    Lighting Control System
    Audio Intercom System
    AV/BGM System
    Gate Barrier
  • Building Management System
  • LPG System
  • Fire Protection System
    Fire Fighting System (Vertical Fire Pump = 1000GPM @ 16.50 Bar)
    Fire Alarm and Voice Evacuation System
    Central Battery System