Consultants: M/s Model Engineering Consultants
Client: M/s Enso Development (L.L.C)
Project Status: Ongoing
Main Contractor : M/s Ten World Contracting LLC Scope of work : Complete MEP Works
G+2P+8+LR Residential Building in Plot no. 3343018 in Al Satwa, Jumeirah Garden City, Dubai, UAE Main
- Ground + 2 Podium + 8 Floors + Roof – Residential Building
- Project Completion = 18 Months
- Defect Liability Period = 12 Months
- Total no. of Apartment = 105nos.
- -1-Bedroom Unit = 98nos.
- 2-Bedroom Unit = 4nos.
- 3-Bedroom Unit = 3nos.
- VRF AC System = 558.76 Total TR
- LV Panel = 1no. 1,812.13 KW TCL
- Standby Generator = 1no. 350KVA
- ELV System
-Structured Cabling System
-CCTV System
-Access Control System
-SMATV System
-Lighting Control System
-Video Intercom System
-BGM System
-Gate Barrier
- LPG System (1no. 500 Gallon LPG Tank)
- Fire Protection System
-Fire Fighting System (Horizontal Fire Pump = 1000GPM @ 15 Bar)
-Fire Alarm and Voice Evacuation System
-Central Battery System