Hadley Heights

Hadley Heights

Consultants: LACASA ARCHITECTS & ENGINEERING CONSULTANTS
Client: LEOS DEVELOPMENT LLC
Project Status: Ongoing
Main-Contractor: TRANSEMIRATES CONTRACTING LLC
Complete MEP Works

PROPOSED G+4P+22 STOREY RESIDENTIAL BUILDING ON PLOT NO. JVC11AHRA002 AT AL BARSHA SOUTH FOURTH 681, DUBAI - UAE

Project Brief Summary

  • Ground + 4 Podium + 22 Floors + Roof - Residential & Commercial
  • Total Built-Up Area = 419,597.06 sq ft.
  • Project Completion = 20 Months
  • Defect Liability Period = 12 Months
  • Total no. of Apartment = 216nos.
    • Studio Unit = 21nos.
    • 1-Bedroom Unit = 129nos.
    • 2-Bedroom Unit = 665nos.
  • District Cooling AC System = 955.74 Total TR
  • LV Panel = 2nos. 2,880.86 KW TCL
  • Standby Generator = 1no. 500KVA
  • ELV System
    • Structured Cabling System
    • CCTV System
    • Access Control System
    • Lighting Control System
    • Audio Intercom System
    • BGM System
    • Gate Barrier
  • Building Management System
  • LPG System
  • Fire Protection System
    • >
    • Fire Fighting System (Fire Pump = 1000GPM @ 18.60 Bar)
    • Fire Alarm and Voice Evacuation System
    • Central Battery System