Consultants: M/S Jouzy Consulting Engineers
Client: M/S. Deyaar Development P.J.S.C
Project Status: Ongoing
Main Contractor : M/S G&B Contracting LLC Scope of work: Complete MEP Works
ZONE 6 TOWER-A (G+P+13) & TOWER-B (G+P+18) ON PLOT NO. 6854517 at ME’AISEM FIRST, DUBAI, UAE
Project Brief Summary
- Ground + Podium + 13 Floors + 18 Floors + Roof (2 Towers) - Residential & Commercial
- Total Built-Up Area = 538,226.00 sq ft.
- Project Completion = 24 Months
- Defect Liability Period = 12 Months
- Total no. of Apartment = 360nos.
-
Studio Unit = 70nos.
- District Cooling AC System = 1399.50 Total TR
- LV Panel = 3nos. 3,990.00 KW TCL
- Standby Generator = 1no. 450KVA
- Busbar Riser = 3nos. (2nos. 1600A TPN+E + 1no. 2000A TPN+E)
- ELV System
- Building Management System
- LPG System
- Fire Protection System
o 1-Bedroom Unit = 178nos.
o 2-Bedroom Unit = 104nos.
o 3-Bedroom Unit = 8nos
-
o Structured Cabling System
o CCTV System
o Access Control System
o Lighting Control System
o Audio Intercom System
o Gate Barrier
o Fire Alarm and Voice Evacuation System
o Central Battery System